Service 04 · Trenchless construction
Horizontal Augering
Install steel casing below roads and rail lines with a guided boring system built for accurate line and grade.


Service 04 · Trenchless construction
Install steel casing below roads and rail lines with a guided boring system built for accurate line and grade.

What it does
Horizontal augering advances steel casing from a launch pit while rotating cutting equipment removes soil from the face. A guided system helps the operator hold the planned line and grade.
The method is a strong fit for gravity systems, large culverts, rural water lines and crossings where accurate casing placement matters.
Syncore operates Akkerman guided boring equipment and publishes experience from 12-inch through 84-inch casing, including a 140-metre, 36-inch crossing beneath two CP rail tracks.

Good fit for
Plan the work
Provide the casing diameter, crossing length, target grade, surface loads and available launch and receiving space.
Pit design, groundwater, soil stability and spoil handling are key parts of the plan.
Syncore can coordinate excavation, augering, casing and carrier pipe installation for a more complete package.
Horizontal augering FAQ
These are the questions that help determine whether this is the right method for the job.
Augering is often preferred for large steel casing and projects that need controlled line and grade from a launch pit. Directional drilling is steerable and usually needs less excavation at the ends.
Syncore publishes horizontal augering capability from 12 to 84 inches. Length, geology, grade, groundwater and pit access determine what equipment is appropriate.
Yes. Syncore's published work includes a 140-metre crossing with 36-inch casing below two CP rail tracks. Rail owner requirements and engineered crossing plans must be addressed before construction.
Horizontal augering needs a launch pit large enough for the machine and casing sections, plus a receiving area. Exact dimensions depend on the equipment, diameter, depth and site conditions.
Depending on the scope, yes. The team can coordinate excavation, casing, PVC or HDPE carrier pipe and related underground services.
Start with the crossing
Send the route, pipe size, location and timing. Syncore will help work out a practical next step.